Primrose Field Mineral Wool Plus Q1 2021
PROJECT DETAILS: Insulation Supply and Install – Mineral Wool Plus CUI Products
LOCATION: CLAWR CNRL Primrose Areas
JOB# 2020-051
START February 19, 2021
COMPLETION April 22, 2021
SIZE OF LINE / LENGTH 20×3 Emulsion Line -2035 M 24x 3 Emulsion Line 1085 M 12×2 – Pipeline 165 M
MATERIALS
• PTFE Teflon Spacer ring
• Mineral wool insulation
• Outer PVC dimple cladding
• Aluminum Cladding
• Moisture Test Ports (EPDM Plugz)
• Aluminum Corrugated Dimple Spacer (High temp)
• Shoe box & Clamp covers
• Caulking (Elastomeric)
• Termination gaskets
• IVS Drains & Vents
CLIENT REFERENCE
Canadian Natural Resources Limited