CNRL Albian Sands -Insulation Upgrades for SCC
PROJECT DETAILS 36”, 48”, 64” Lines re-insulation with 4 layer system
LOCATION CNUL Albian Sands
JOB# 2020-121
START September 14, 2022
COMPLETION October 31, 2022
SIZE OF LINE / LENGTH
NPS 36 Pipeline 100 LM
NPS 48 Pipeline 100 LM
NPS 64 Pipeline 50 LM
MATERIALS
• PTFE Teflon Spacer ring
• Mineral wool insulation
• Outer PVC dimple cladding
• Aluminum Cladding
• Moisture Test Ports (EPDM Plugz)
• Shoe box & Clamp covers
• Caulking (Elastomeric)
• Termination gaskets
• IVS Drains & Vents
• Insulated Soft Covers
CLIENT REFERENCE
Canadian Natural Resources Limited